Installation of Day Beacon Channel Markers
SUS performed the removal of 20 each Concrete Anchored Marine Navaigational Buoys and replaced them with the installation of 20 pile-supported channel markers along a key section of the Intracoastal Waterway, stretching from Little Egg Harbor to the Metedeconk River. This project enhances the safety and navigability of this busy waterway.
The project involved driving 70 linear foot pipe piles at precise GPS coordinates utilizing a 200 ton crane situated on a 155’ x 55’ ABS-rated crane barge. Once driven, fabricated steel hangers along with Owner supplied day beacons and marker lights were installed using a telescopic boom lift secured to the crane barge. All work was performed in close coordination with the USCG and a disabled veterans construction firm.