< Back to Projects

Installation of Day Beacon Channel Markers

location
Cape May, NJ
Owner
USCG
General Contractor
Joint Forces Construction
Marine Construction

SUS performed the removal of 20 each Concrete Anchored Marine Navaigational Buoys and replaced them with the installation of 20 pile-supported channel markers along a key section of the Intracoastal Waterway, stretching from Little Egg Harbor to the Metedeconk River. This  project  enhances  the  safety  and  navigability of this busy waterway.

The project involved driving 70 linear foot pipe piles at precise GPS coordinates utilizing a 200 ton crane situated on a 155’ x 55’ ABS-rated crane barge.  Once  driven,  fabricated steel hangers along with Owner supplied day beacons and marker lights were installed using a telescopic boom lift secured to the crane barge. All work was performed in close coordination with the USCG and a disabled veterans construction firm.

Commercial Diving Capabilities
No items found.
Inspections Capabilities
No items found.
Repairs and Maintenance Capabilities
No items found.
Marine Demolition and Salvage Capabilities
No items found.
Shoreline Restoration and Enhancement Capabilities
No items found.

Project Gallery

No items found.

Related Projects